Author Topic: U-190... back at it again!  (Read 5814 times)

0 Members and 1 Guest are viewing this topic.

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190... back at it again!
« on: 03 Jan , 2017, 11:11 »
As of 01-Jan-2017, I am restarting my U-190 project, with a personal deadline set for this year.   
I aim to push forward with this as my primary project.
So far in  my first build session of 2017, I managed to make good progress on hull detailing.

I am very pleased that RC Subs has recently released a new SKU-025 upgrade set to correct the U-190 tower (which was a copy of the U-505 tower).
Here is my main blog site: 
and my FB photo album(s): 
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
Re: U-190... back at it again!
« Reply #1 on: 04 Jan , 2017, 09:13 »
One long evening saw a lot of progress adding the big PE pieces added to hull.

Bow lower flood holes
One of the 2 remaining "major" hull PE pieces added to the lower bow.
Luckily the SRS photoetch piece keys to molded features on the plastic hull, so alignment is very straightforward.
(The Eduard solution has 2 individual PE pieces, so alignment was not as easy.)

Sternmost lower flood holes (near the stern torpedo tubes)
Though only medium-sized and covering fewer holes... this PE piece (again by SRS) was moderately challenging to install. 
I dry-fit the hull halves, so I could align the new PE piece to the one already installed on the starboard hull.
(The Eduard solution has 2 individual PE pieces, so again... alignment was not as easy.)
Lengths of dual-rivet strips are provided separately, which will go on later.
« Last Edit: 04 Jan , 2017, 13:47 by GlennCauley »
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline Piet

  • Midshipman Cadet
  • *
  • Posts: 13
  • Gender: Male
Re: U-190... back at it again!
« Reply #2 on: 07 Jan , 2017, 16:12 »
Looks real good! 8)

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190 progress: 7/8 Jan 2017
« Reply #3 on: 09 Jan , 2017, 09:35 »
Good but messy progress on the hull of U-190... rotsa grinding, shaving, filing... and vacuuming my clothes of plastic dust afterwards.   :o
Getting closer to attaching the hull halves!
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190 tower... lots of progress!
« Reply #4 on: 13 Feb , 2017, 08:29 »
In the past few weeks I have made huge progress on the U-190 tower:

  • Tower reconstruction.  The U-190 tower comes directly from the U-505 kit, although there are noticeable differences between the towers inside & outside (particularly on the port side). Thankfully, RC Subs has created a very good "update" set to correct the U-190 tower.
  • Detailing tower interior - PE and scratchbuilt details
  • Side railings - scratchbuilt from brass wire & eyelets
  • Schnorkel external pipe & backstop - HUGE improvements
  • Miscellaneous external details:  vents, ladders, grab rails, hatches, ammo bins, etc.
I have updated my main blog site as well as posting periodic Facebook photo albums:  http://gc-scalemodels.ca/U190/
« Last Edit: 27 Feb , 2017, 11:24 by GlennCauley »
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190 tower : Snapshot 06-Mar-2017
« Reply #5 on: 06 Mar , 2017, 10:44 »
In less than 1 month - working weekends and a few hours most nights - the U-190 tower has gone from a pile of (mostly) unassembled parts... to THIS.
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
HFDF antenna
« Reply #6 on: 13 Mar , 2017, 07:25 »
The direction finder loop on U-190 had a HF (high-frequency) antenna on it.    The kit only supplies the basic loop, so I had to scratchbuild the HF antenna and combine it with the DF loop.
Thank you to NZSnowman for making a wonderful 3D model of the HFDF !  :D

Making the HF antenna looked daunting, but after I found I had the correct raw materials, it turned out to be not that difficult:
  • 1/16" brass tubing
  • super-fine hollow brass tubing (by Griffon Model)
  • 0.010" fine brass wire
  • styrene rod  (various sizes)
  • fine solder

« Last Edit: 13 Mar , 2017, 09:39 by GlennCauley »
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline falo

  • Admiral
  • *
  • Posts: 514
  • Gender: Male
Re: U-190... back at it again!
« Reply #7 on: 13 Mar , 2017, 23:53 »
Hi Glenn,


excellent work, thanks for the pictures.



Regards
falo

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190 armament :: AA guns
« Reply #8 on: 14 Mar , 2017, 09:04 »
Getting to work on the U-190 armament.
First up, the  double-barrel 2cm Flak C38 on M43U Zwilling mounts, with short shields
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
Hull together!
« Reply #9 on: 21 Mar , 2017, 10:46 »
Full steam ahead, damn the torpedoes.  :)

I have finally assembled got the hull together!
  • assembled the hull halves
  • installed the faux pressure hull
  • installed the saddletank tops
Now working on the following:
  • adding ribbing inside the main flood channel
  • adding other internal structures atop the pressure hull
« Last Edit: 21 Mar , 2017, 14:00 by GlennCauley »
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190... deck ends
« Reply #10 on: 03 Apr , 2017, 10:31 »
After a few weeks away from U-190, I added the bow & stern deck ends.
The kit parts were used, and all detail was removed.   I then added the PE deck pieces and other details.   Cast brass cleats will be added later.
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline NZSnowman

  • Admiral4
  • *
  • Posts: 2,419
  • Gender: Male
  • U-1308
    • U-1308 - Wikipedia
Re: U-190... back at it again!
« Reply #11 on: 05 Apr , 2017, 13:31 »
Glenn, it possible too late, but you bow of your model of U-190 look like its design for water-refuelling. I believe U-190 just had a standard bow.

U-873 had a bow for water-refuelling. Perhaps, Dougie could also conform this.

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
Re: U-190... back at it again!
« Reply #12 on: 05 Apr , 2017, 15:05 »
Thank you for the information, but at this point in the build I won't be changing the bow.   
It would be very difficult to fill that area, create & install a PE piece to match the anti-slip pattern already there.
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190 progress :: 19-Apr-2017
« Reply #13 on: 19 Apr , 2017, 09:04 »
Progress on the hull is substantial, and it is nearing the painting stage.   

Currently adding the running gear:    propeller shafts (replaced with brass tubing), rudders, dive planes (bow & aft)

I will be updating the main blog site soon, but here are a few Facebook photo albums for reference:


Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
Re: U-190... armament
« Reply #15 on: 14 Jul , 2017, 07:48 »
I have completed 2/3 of the tower armament:
I have one of the 20mm AA guns using some specific parts and a certain shield, but for the second one I will be using slightly different parts and shield.    (Mix & match time!)





Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190... DONE!
« Reply #16 on: 18 Sep , 2017, 12:59 »
I am very happy to announce that U-190 is finally DONE as of 17-Sep-2017.

The display base is the final thing left to be done.

I hope to get some proper photographs of the model in the next few weeks, something better than what my iPhone takes.  ;)
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190... DONE!
« Reply #17 on: 10 Oct , 2017, 11:31 »
U-190 was completed 1 week before CAPCON 2017.
It placed 2nd in its category (flanked by 2 of my other models).

Unfortunately, I broke the forward rigging shortly after CAPCON 2017 and am preparing to repair/replace it.
Then hopefully I will have the chance to get some good photos of this beast which claimed 1.5 years of my time.  :D

Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca

Offline falo

  • Admiral
  • *
  • Posts: 514
  • Gender: Male
Re: U-190... back at it again!
« Reply #18 on: 10 Oct , 2017, 13:50 »
Hi Glenn,


congratulations for this total success. U-190 surrounded by two Japanese Midget Subs – but all three models were built at the same shipyard  ;)


Regards
falo

Offline GlennCauley

  • Admiral
  • *
  • Posts: 646
    • Models by Glenn Cauley
U-190... done!
« Reply #19 on: 27 Mar , 2018, 12:36 »
http://gc-scalemodels.ca/U190/

U-190 has been completed for a short time, and recently competed in HeritageCon 12 (25-Mar-2018) where it won its category and also the Arthur William Redding patron award (for Navy vessels).

Before HeritageCon 12, I took several weeks to refinish the entire paint job:  entire deck, upper & lower hull, and tower.
I was not complete satisfied with the finishing & weathering job I had done initially, but now I am satisfied.

I am hoping to get a more professional photo shoot done soon.
Glenn Cauley
President, IPMS Ottawa
gc-scalemodels.ca