This summer I was able to add a large number of new things and updates (listed below) to my
U-1308 drawing.
There are now over 61,000 objects in this dorsal view and this is reveal in the size of the PFD file which has grown to over 22MB
Significant changes between this version and the previous are: the wooden deck, bridge/Wintergarten and the piping around the engine room.
A reminder about this PDF document, it contains different layers to make viewing easier. These layers can be view all together or separately by selecting or deselecting layers within
Adobe Reader. To best view the drawing, it is best to select only the layers that you want to see, another the drawing can become very hard to view.
Happy view
Simon
Download LinkPDF Version (22MB)http://www.mediafire.com/view/?yi20cy9p47wfgb7Zip Version (10MB)http://www.mediafire.com/?rb1bc3yvy9zhb3d
Version 0.4 ~ 24 April 2012● Added missing pressures hull markings.
● Added missing labels for the Conning Tower Casting.
● Added missing valve in the inlet Schnorchel piping.
● Added deck hatches.
● Stern Torpedo Loading
● Galley
● Exhaust
● Exhaust Outlet Control Valve
● Mid section access
● Fuel Oil
● Main Vent Access
● Engine Lubricating Oil hatches.
● Added rear Casting Bollards.
● Added High Pressure Air Lines for Bank 6.
● Tweaked alignment of the stern steel plating.
● Tweaked alignment of the saddle tanks.
● Tweaked alignment of the Fuel Oil and Engine piping.
● Tweaked alignment of the Low pressure exhaust gas and emergency blowing systems.
● Tweaked alignment of the Main exhaust gas blow valve
● Corrected the smaller metal deck access hatches.
● Increase compass access opening.
● Updated Interconnector MB & ROL Tank 2
● Corrected pipe alignment.
● Corrected Saddle Tank openings.
● Revise Emergency vent valves to match correct valves type.
● Added more detail to Vent valves, main ballast and reserve fuel oil tanks.
● Corrected pipe alignment.
● Added pipe colour to the first section of piping only.
● Updated Exhaust System.
● Reduce the number and size of bolts on the pipe flanges.
● Increase size of the pipes over the muffler exhaust valves.
● Added locking plates to the pipe flanges.
● Added Grease Distributors.
● Added control linkage for Exhaust valves and grinders.
● Added late war Exhaust outlets.
● Tweaked alignment of Exhaust outlet pressure hull openings.
● Tweaked alignment of Exhaust outlet valves.
● Added Muffler Exhaust Valve.
● Added aft section of Fuel oil compensating system