U-154 a Class IXC U-Boat whose keel was laid on 9/21/1940 at AG Weser. Bermen
launched 4/21/41
commissioned 8/02/41
8 patrols
1st left 2/07/42
reached Lorient 3/01/42
2nd left 3/11/42
returned 5/09/42
3rd left 6/04/42
meet and transfered torpedos to U-564 on 8/05/42 -- This is the event that I'm interested in.
returned Lorient 8/23/42
On the 9th patrol U-154 was sunk with all hands lost 7/03/44
I feel that there was not a lot of down time between patrols 1 and 3 for any major refitings. There was about 30 days between the 2nd and 3rd patrols but?
Therefore I feel that on the meeting date of 8/05/42 the U-154 might look like it did when it was launched.
Any help on this would be great.
I'm starting with the Revell of Germany U-505 - RVL-5114 - 1/72 and going to add and change as needed.
Just found Glann Cauley's U-505 build website and will start reviewing it next.
1st Conning tower -- should be first style not what the model U-505 shows at time of capture.
2nd Planning to add 105mm deck cannon
3rd What else needs to be changed -- your help is requested here
extras that are avaible
Nautilusmodels TYPE IXc U-BOAT DECK
EDUARD EDU-53106 1/72 Ships- U Boat IXC for RVL
EDUARD EDU-53107 1/72 Ships- U-Boat IXC Pt.2 for RVL
EDUARD EDU-53108 1/72 Ships- U-Boat IXC Pt.3 for RVL
Just found and reviewing
http://www.rcsubs.cz/ deck
AMP PE 7232
AMP PE 7203 sheets 1 and 2
105 deck gun Have found pics of one and Photo Etch for it from
http://www.rcsubs.cz/Thanks in advance for any help.
Later Tim