"How long til launch?"
A bit, I think...
The ET is virtually done. Once the NiPart 3D printed Frost Ramps arrived, they got a coat of color, and then got placed onto the ET. The pressurization pipes are now 0.039" music wire.
After all the plumbing was finished, there were some small decals from the Real Space Model's 1/72 Shuttle set that go put in place, then the whole thing was coated with Testor's Dullcoat.
Soon , The SRBs will be placed onto the ET, using the aft attach rings and the forward 3/32" steel rod which will engage hole on the NiParts SRB forward sections.
Meanwhile, the Orbiter is getting "clad" by section of Thermal Protection System "blankets" made from Johnson & Johnson Cloth Bandage Tape, which was a woven texture that looks a lot like the actual blankets of the Shuttle, close up. the pattern is being taken from photos and TPS locations maps, obtained on-line. The photo attached shoes the Port side of the Orbiter, behind the Crew Module-Payload Bay line.
The last photo attached shows the same process being used to cover the OMS pods.
The work continues...