The last couple of weeks did not much on my baby,the workshop was closed
,
it was to hot to handle,well the Heineken`s taste good in these temparatures in the local pubs
.
Here is a small update.
These gratings were allready broken when I lifted the baby out the box(a few years ago),
this was on the left and on the right.
Glued,
Installed,
This bulkhead was for the original Robbe WTC(Water Tight Compartment),
my WTC will be much bigger,I will using a 125mm PVC pipe(Toneburst design
,not my idea) instead off a 105mm KU pipe(Robbe design),
I am hoping that this will increase the stability of the boat when she in the water,surface or submerged.
Removed from the aft section,
Cleaned,sanded,and maked the hole bigger,
Installed,