HI all
The beginning of the work realized on the pipe of the air inlet of the schnorchel.
the pipe is realized with the sprue, the crown is made in slices of plasticard realized with the punch .The bolts are made with stretched sprue cut in small portions and stuck
the weldings on the pipe are realized with the stretched sprue (in blue)
The manufacturing of the "air plug " presents on the new mast of the schnorchel (It is necessary to assure a good alignment)
Everything is maintained in a temporary way, because I have to make moulding in resin
And finally the realization of a piping presents on starboard port on most of the VII-C/41
I think that the Germans engineers make of improvisations!! :shock:
A plus
Nicolas