For the third seasons the large iron gates of the shipyard are locked for the winter and the boatyard is closed. Again the dockworkers look back over the work for the last six months on U-1308. They finish the ribbing, framing, pressure hull and casting of U-1308. They install the Direction Finder Antenna Loop, the FuMO-61 Hohentwiel U radar, the FuMB-9 Wanze and FuMB-35 Athos. They also nearly finish the piping under the decking, and putting in the torpedo tubes.
Again thanks everyone for your help, for the photographs and information with my drawing. I will still found a little bit of free time to check the boards over the next few months.
Wish you all the best for your summer or winter.
Happy modelling, Simon.