Author Topic: 1/260 ST:TMP Drydock Build (WIP)  (Read 7018 times)

0 Members and 1 Guest are viewing this topic.

Offline Rokket

  • Administrator
  • *
  • Posts: 2,308
  • Gender: Male
  • Submarine Enthusiast
    • AMP - Accurate Model Parts
Re: 1/260 ST:TMP Drydock Build (WIP)
« Reply #45 on: 04 Jan , 2018, 18:18 »
That saucer is as amazing as the rest. What a great idea, and what a lot of work! And wires...
AMP - Accurate Model Parts - http://amp.rokket.biz

Offline NemVia

  • NemVia
  • Ensign
  • *
  • Posts: 30
  • Gender: Male
    • NemVia.net
Re: 1/260 ST:TMP Drydock Build (WIP)
« Reply #46 on: 10 Feb , 2018, 20:01 »
 February Updates - 2018
Hi Everyone! This months updates are pretty good. First I have started to add the Black Velvet Material to the Base of the model. This will help make the model appear to floating over the base. The panel frames will be supported by two screws on each side of the frames to hold the structure up and help keep it level. This is also a very good sign because it means that I will soon be adding the Enterprise permanently into the drydock, then adding the port side panel frame assembly into place. I've added all of the wiring and some new lighting to the rear hanger bay on the dock by using the LED light strips. They have some interesting details on the strips that would make the lights appear to be a natural fixture on the dock. I will also be replacing the lightings on all the other hanger on the dock as well. It just looks better.
On the Enterprise I was originally going to use magnets to hold the two saucer halves together, but because the pieces don't line up very well, I've decided to permanently seal up the saucer. The LEDs should last quite a long time and even if there were a problem it would be impossible to work on the Enterprise in the dock unless I take the whole port side off of the dock and remove the ship. That Ain't gonna happen. In cementing the saucer together, I've found a lot of other gaps that needed to be fixed or repaired. The bottom impulse engine does not meet up with the saucer, so I had to use some styrene and putty to fix that problem. Also, the collar of the Dorsal was not molded very well so I had to replace that as well and then putty, sand and repaint all of these areas. Where the pylons meet the secondary hull there was a gap at that point, so I've puttied that as well on both pylons. The reason for holding off on that was because the model was going to be handled a lot before I added it to the drydock and I knew because of the stresses and weight of the model there would be cracks forming in the putty. So I waited until now so there would be less handling of the model. I also did the same with the Deflector Housing. Because of the way the Secondary hull was molded and put together the two halves did not line-up, so there was a gap on the port side where the pieces would meet. I was originally going to use magnets with this part as well, but decided to seal it permanently and putty up the seam to get rid of the gaps.
There are just a few more touch-ups to do and then the Enterprise will finally be added to the dock. I can then add the Port Side Panel framework and begin the final wiring of the model.
On a side note, there might be another delay with this build as my landlord decided not to pay his mortgage and has gone into foreclosure with our unit so we will be moving to another location. But I will try to get back to this project asap.
I have 11 new pics in the February Updates - 2018 page. Check-em out and I'll get back to you soon. Have a great month everyone.
Mark.
...once it's activated, there's no way to stop it! - Scotty - Dma

Offline Rokket

  • Administrator
  • *
  • Posts: 2,308
  • Gender: Male
  • Submarine Enthusiast
    • AMP - Accurate Model Parts
Re: 1/260 ST:TMP Drydock Build (WIP)
« Reply #47 on: 14 Feb , 2018, 01:29 »
Great pic, so full!
AMP - Accurate Model Parts - http://amp.rokket.biz